Within the scope of the contract no. 2006-ISD/4 about the supply of 1034 units signed by TEIAS and our company, short-time current tests and short-circuit withstand capability test for Medium Voltage Current transformers were conducted at CESI Laboratories on 06.04.2007. The test results were presented to and approved by TEIAS. |